We will start by pegging the ground then we dig the foundation, placing reinforcement, concrete layout, building the box then compacting,after compacting we put the plastics then the match wire,after that we put the concrete then wait about 2-3days to dry,then build the structure but before we start building the structure we put the damp course then build the structure upto roof level then this is where roofing comes in..
We skim the wall to make it smooth then let it dry before you sandpaper the wall, and then apply plaster prime
We build the roof trusts then put the roof on top and level, balance it and tighten the roof with a roof wire and put the plastic roofs underneath and put the bandrings then tiling ontop then ridges
Putting the bandrings then level them so it can be straight then install it but it depends if you would want the ceiling that would need strips or rhinolite, after this we apply the cornice then paint your ceiling